1.
Machine Tool is disassembled down to the
table base riding on the X-Y ways with ball
screws exposed.
- Clean
and lube ways and ball screws.
- Remove
U-V covers, expose ways and screws
- clean and lubricate.
- Remove
and rebuild upper and lower head assembler.
- Remove
work tank, send out for Media Blast
and powder cast.
- While
disassembled, strip, clean, prep and
paint machine tool casting and sheet
metal panels.
- Rebuild
rear seal.
- Reassemble
all components.
- Install
new wire guides, power contacts and
flush nozzles.
- Install
new H-Tec Speed Up Kit (15-16 sqs./hr.)
as required.
- Add
3 1/2" floppy disk drive as required.
|