2.
Power Supply/CNC Control.
- Disassemble
sheet metal and remove printed circuit boards.
Wash printed circuit boards and electronic
box to remove oil, dirt and grinding dust.
Dry for two days then reassemble.
- Inspect
all connections, cables, fiber optics, relays,
transformers and switches.
|